SI.NO DESCRIPTION OF WORK TYPE OF WORK COMPLETED DATE ON
SOUTHERN RAILWAY
1 Construction of ROB Stage III Pile Foundation etc., MTP Railway at Velachery Station, Chennai (Steel and cement department supply) ROAD OVER BRIDGE (ROB) February 2005
2 MRTS-Phase-1-Chennai Beach-Tirumailai-Construction of Retaining wall along road side of Buckingham canal at mundakanniamman Koil Station Building RETAINING WALL September 2011
NPCIL (NUCLEAR POWER CORPORATION OF INDIA)
1 Construction of foundation, flooring & other civil works for PEB warehouse No.2 in CMM complex at KKNPP 3 & 4 WARE HOUSE October 2018
2 Construction of kitchen and multipurpose facility hall & VIP dining area at KKNPP 3 and 4 site BUILDING WORK October 2018
3 Construction of 650N road and intercepting drain in KK: 3-6 site at KKNPP in kudankulam village ASPHALT ROAD AND DRAIN WORK January 2019
4 Construction of open storage yard, roads and cross drainage works in CMM complex at KKNPP 3 & 4 YARD,ROAD DEVELOPMENT AND DRAIN WORK January 2019
5 Construction of Road, Storm water drains and Electrical Cable trench in Zone-l Area of Anuvijay Township at Chettikulam Village ASPHALT ROAD AND DRAIN WORK May 2019
KPL (KAMARAJAR PORT LIMITED)
1 Construction of concrete road and gate complex in Kamarajar port limited CONCRETE ROAD, BUILDING AND CULVERT WORK November 2018
2 Extension of Concrete Road to Customs Building an Providing Vehicle Parking Yard with Paver Block inside Administration Office Area of KPL CONCRETE ROAD, PAVER BLOCK WORK November 2018
HIGHWAYS DEPARTMENTS
1 Construction for Road Under Bridge RUB at Km.0/6 of Nanganallur road in lieu of exg. Level crossing near Palavanthangal Railway Station. ROAD UNDER BRIDGE(RUB) May 1997
2 Improvements to Radial roads in and around Chennai City -Package No.4 – Two lanning & Strengthening of Vandalore – Walajabad road Km.30/4 to 63/8 and Providing hard shoulders to Tambaram – Mudichur road – Km.0/0 to 7/4 including culverts & Bridges. ASPHALT ROAD WORK March 2001
3 Construction of ROB at Km 0/10 of Omalur Sankari Road near Omalur Railway Station, Salem ROAD OVER BRIDGE (ROB) January 2005
4 Re – Construction of High Level Bridge across Manimuktha river at Km.53/10 – 54/20 of Cuddalore – Vridhachalam – Salem Road. HIGH LEVEL BRIDGE (HLB) March 2007
5 “Short Term Improvement of Thiruvottiyur- Ponneri- Panchetti road from Km 4/500 to 13/500 in the Chennai – Ennore Port road Connectivity Project in the state of TamilNadu” ASPHALT ROAD WORK April 2009
6 Construction of High Level Bridge across Adhambakkam lake at KM 1/400-1/750 of Southern sector of inner Ring road from KM.14/1 of NH 45 to meet at KM.13/4 of Chennai – Old Mahabalipuram Road (Rajiv Gandhi Road) in Chennai City HIGH LEVEL BRIDGE (HLB) February 2011
7 Widening to two lane and Strengthening of Singaperumal koil – reddykuppam road km 4/5 – 9/0 ASPHALT ROAD December 2012
8 The work of “Construction of Road Over Bridge in lieu of L C. No. 36, Railway Km 36/12 -14 in between Vandalur and Guduvanchery railway stations near Urappakkam.(Foreclosed the contract due to Land acquisition problem) ROAD OVER BRIDGE (ROB) December 2013
9 The work of “Construction of road over bridge in lieu of L C. No. 14, in between Thirunindravur and Thiruvallur railway stations near Veppampattu railway station. (Foreclosed the contract due to Land acquisition problem) ROAD OVER BRIDGE (ROB) March 2013
10 Construction of ROB in lieu of existing LC No 5 Railway km 13/4-6 in between Ambattur and Villivakkam Railway Stations at Pattravakkam ROAD OVER BRIDGE (ROB) March 2014
11 Package 10, Junction Improvements, Strengthening, and Improvements works in Chengalpattu (H), C & M Sub Division jurisdiction ASPHALT ROAD December 2017
CORPORATION OF CHENNAI
1 Widening of exg. Napier bridge across Cooum river in Kamarajar Salai Division.80, Chennai City NAPIER BRIDGE July 1999
2 Construction of High Level bridge in lieu of exg. Cause way across Cooum river in Naduvankarai – Chennai City HIGH LEVEL BRIDGE (HLB) April 2001
3 Construction of Vehicular Subway in lieu of existing level Crossing at Harrington Road in DN-72&78, Zone-V” – Chennai City. ROAD UNDER BRIDGE (RUB) July 2006
4 Package – 2 (31 Roads) Forming and Laying BT Road at Various street in Dn. 168,169,185 & 188 ASPHALT ROAD December 2012
5 Package – 1 (25 Roads) Forming and Laying BT Road at Various street in Dn. 183, 185 ASPHALT ROAD January 2013
6 Package – 3 (30 Roads) Forming and Laying BT Road at Various street in Dn. 189,190 & 191 ASPHALT ROAD February 2013
7 Integrated road development” including roads ,Street Lights and Street furniture at various Roads in extended areas in Zone – XIV (Package-3 A) ( 14 Roads) ASPHALT ROAD March 2013
8 Integrated road development including storm water drain, ducts for cables, Street Lights and Street furniture’s at various Roads in extended areas in Zone VII –Package – 1 (14 roads)”. ASPHALT ROAD AND DRAIN March 2013
9 Zone XIV– “Chennai Mega City Development Mission (PHASE -2)” Integrated road development including storm water drain, ducts for cables, Street Lights and Street furnitures at various Roads in Ward 189, in Zone – XIV – Package 2 – (11 roads)”@ Corporation of Chennai ASPHALT ROAD AND DRAIN November 2013
10 Zone XIV– “Chennai Mega City Development Mission (PHASE -2)” – Integrated road development including storm water drain, ducts for cables, Street Lights and Street furnitures at various Roads in Ward -191, in Zone – XIV – package 3 – (5 roads)” @ Corporation of Chennai ASPHALT ROAD AND DRAIN November 2013
11 Zone XIV– “Chennai Mega City Development Mission (PHASE -2)” – Integrated road development including storm water drain, ducts for cables, Street Lights and Street furnitures at various Roads in Ward – 187 & 189, in Zone – XIV – Package 5 – (23 roads)” @ Corporation of Chennai ASPHALT ROAD AND DRAIN December 2013
12 Zone- XII / C.No.E1/5077/2012 /Dated.03.05.2013 – Package- 2A- (21 Road works) Integrated road development including ducts for cables, Street lights and Street furniture at various Roads in Ward – 164&165 Zone XII under Chennai Megacity Development Mission Fund ASPHALT ROAD January 2014
13 Zone VII– “Chennai Mega City Development Mission (PHASE -2)” – Integrated road development including storm water drain, ducts for cables, Street Lights and Street furnitures at various Roads in Ward – 79,81 & 82, in Zone – VII– Package 1 – (8 roads)” @ Corporation of Chennai ASPHALT ROAD AND DRAIN February 2014
14 Package-2(19 Road works &14 Footpath works ) Relaying with CBC 40mm thick by Paver Finisher after Cold Milling to a depth of 40mm at various roads in Zones-IX and improvements to Footpath using granite Kerb and Slab at various roads in Zone- IX for the year 2012- 13@ Corporation of Chennai dated 15.02.2013” ASPHALT ROAD AND FOOTPATH March 2014
15 Package-2 ( 46 Road works) Integrated road development including Storm water drain, ducts for cables, Street Lights and Street furniture at various Roads in ward no185, 186 &187 Zone XIV under Chennai Megacity Development Mission ASPHALT ROAD AND DRAIN October 2014
16 Package-3 ( 41 Road works) Integrated road development including Storm water drain, ducts for cables, Street Lights and Street furniture at various Roads in ward no168,169 ,187 & 188 Zone XIV under Chennai Megacity Development Mission Fund ASPHALT ROAD AND DRAIN October 2014
17 Package- 1 – (118 Roads ) Integrated Road work at Various roads in Dn-192, Zone-XV Under Chennai Megacity Development Mission 1 Savings Fund”@ Corporation of Chennai ASPHALT ROAD April 2014
18 10000 roads (PACKAGE- 30): 39 Road works Forming, strengthening and laying the road at Various Street in Dn -189, Unit- 43, Zone- XIV ASPHALT ROAD February 2015
19 10000 roads Package-39 (41 Road Works) Forming, strengthing and laying the road at various Roads in Dn -190, Unit- 43, Zone- XIV ASPHALT ROAD February 2015
20 Z.O.VII.C.NO:E1/23818/07/2013 10000 roads Package No: 07 ( 23 Roads) Forming and Laying the BT Road by Paver Finisher at Various Streets in Division -82,Zone-VII ASPHALT ROAD August 2015
21 Z.O.VII.C.NO:E1/23818/06/2013 10000 roads Package No: 06 ( 22 Roads) Forming and Laying the BT Road by Paver Finisher at Various Streets in Division -82, Zone-VII ASPHALT ROAD August 2015
22 Z.O.VII.C.NO:E1/23818/13/2013 10000 roads Package No:13 ( 8 Roads) Forming and Laying the BT Road by Paver Finisher at Various Streets in Division – 83, Zone-VII ASPHALT ROAD August 2015
23 Z.O.VII.C.NO.E1/21053 /2013 Package-2 (81 Road works) Integrated road development including Storm water drain, ducts for cables, Street Lights and Street furniture at various Roads in ward no 81 & 82 Zone VII under Chennai Megacity Development Mission Fund ASPHALT ROAD AND DRAIN January 2016
24 BRR.C.No.B1/362/2015 Package 24 Strengthening and Relaying the Road with DBM and CBC after cold milling by Paver Finisher using Plastic waste along with Traffic Improvement work at 9 Bus Route Roads in Zone- 5,7 & 8 ASPHALT ROAD WITH MILLING January 2016
25 BRR.C.No.B1/360/2015 Package 22 Strengthening and Relaying the Road with DBM and CBC after cold milling by Paver Finisher using Plastic waste along with Traffic Improvement work at 4 Bus Route Roads in Zone – 1 & 4 ASPHALT ROAD WITH MILLING March 2016
26 Improvement to 75 Nos of interior roads in Dn 192 to 196, Zone -15 Package 3 & 4 ASPHALT ROAD WITH MILLING September 2016
27 Improvements to the interior B.T road in Zone 14 Package – 29(15 roads) & 4 ASPHALT ROAD WITH MILLING April 2017
28 Package – 7 Attending to Temporary Restoration of Damaged roads due to Flood in North East Monsoon 2015 at 12 Bus Route Roads in Zone- 8,9 &10 & 4 ASPHALT ROAD WITH MILLING March 2017
29 Package – 27 Improvements to the Interior Roads in Zone-XV,(19 Roads), & 4 ASPHALT ROAD WITH MILLING March 2017
30 Providing and laying Cement concrete roads at 23 Nos of interior roads Zone 13, Package – 19 & 4 Concrete road August 2017
31 Improvements to the Marina Loop road by Laying cement concrete road, forming cycle track , Paving with granite footpath with railing of stainless steel pipe and Granite Pedestal stone along with Construction of SWD, Construction for RCC duct for service utilities and construction of underground drainage system etc from junction of Kamarajar salai towards Pattinampakkam in division -125, zone IX, Ch 850 m to 1800m & 4 Cement Concrete road, SWD, Footpath and RCC duct March 2018
32 Package – 19 Improvements to the Interior BT Roads in Zone-VIII, DN-101,103,104,105 & 106 (52 Roads) & 4 ASPHALT ROAD August 2018
AIRPORTS AUTHORITY OF INDIA
1 Re – Construction of Taxiway ‘J’ from Junction of Runway – 30 to Runway – 25 at Chennai Airport CONCRETE PAVEMENT TAXIWAY June 2007
2 Construction of RCC Box Drains behind Bay No. 9 & 10 at Chennai Airport, Chennai RCC BOX DRAIN August 2008
3 Re – construction of bays No.9 & 10 for parking of wide bodied aircraft’s at Chennai Airport, Chennai CONCRETE PAVEMENT (PARKING BAY) December 2008
4 Construction of Security Compound Wall @ Runway – 12 for providing 150m Strip at Chennai Airport, Chennai (Phase – II). COMPOUND WALL February 2009
5 Re – Construction Of Bay No 27 at Chennai Airport, Chennai CONCRETE PAVEMENT (PARKING BAY) December 2009
6 Re – Construction of Bay No.8 including construction of RCC Box drain across the Proposed Area at Chennai Airport, Chennai CONCRETE PAVEMENT (PARKING BAY) AND DRAIN< January 2010
7 Construction of Perimeter wall for encompassing AAI land at North of Runway 07 at Chennai Airport, Chennai PERIMETER WALL November 2010
8 Construction of Angular taxi track (F1) connecting main runway 07-25 and B taxi track at Chennai Airport Chennai”. CONCRETE PAVEMENT (TAXITRACK) CONNECTING MAIN RUNWAY Feburary. 2013
Indian Institute of technology
1 “Re- Carpeting of major roads at IIT Madras Campus”, Chennai–600 036 ASPHALT ROAD June 2009
2 Re-carpeting minor roads at IITM and constructing new roads at various locations on minor roads at IITM Campus ASPHALT ROAD June 2015
CHENNAI PORT TRUST
1 Providing Water Bound Macadam Road from South Tower of Old Entrance to Hazardous cargo shed WBM ROAD June 08
CMDA (Chennai Metropolitan development Authority)
1 Providing Gravel filling, Cement Concrete pavement, Storm Water Drain Culvert etc. for Proposed Lorry Parking Yard in about 7.62 acres in S.No.173/2pt, 198/1&2pt and 201/1&2 of Koyambedu village, Koyambedu, Chennai – 92 (AREA = 24800 SQM) LORRY PARKING YARD AND DRAIN January 2011
2 Relaying of CC Road (M30) and Providing R.C.C. Storm Water Drain in Truck bays ‘H to N’ Blocks of Vegetable Market at Koyambedu Wholesale Market Complex, Koyambedu, Chennai – 92 CONCRETE PAVEMENT AND DRAIN (TRUCK BAY) December 2012
3 Relaying of CC Road (M30) and Prov R.C.C. Storm Water Drain from Gate No.7 to 14 and Part of ‘A’ Road at Koyambedu Wholesale Market Complex, Koyambedu – 92 CONCRETE PAVEMENT AND DRAIN (TRUCK BAY) December 2012
4 Widening and Strengthening of part of ‘E’ road at Koyambedu Wholesale Market Complex, Koyambedu, Chennai- 92 ASPHALT ROAD February 2013
5 Providing and Relaying of RMC (M30) Road and RCC SWD for North and West side of Flower Market @ KWMC, Koyambedu CONCRETE PAVEMENT AND DRAIN December 2013
TAMIL NADU HOUSING BOARD
1 Providing gravel soling and WBM to on site roads in Phase.I area at Ambattur Site & Service Ambattur. WBM ROAD June 1996
2 Providing gravel soling and WBM to on site roads in Phase.II area at Ambattur Site & Service Ambattur. WBM ROAD December 1995
SICAL DISTRIPARKS LIMITED, CHENNAI AND TUTICORIN (PRIVATE WORKS)
1 Developing Container Yard with Road at our CFS site, Ponnery High Road, Chennai – 600120 – Sical Distriparks Limited, Chennai (AREA = 18587 SQM) DEVELOPING CONCRETE YARD PAVEMENT February 2007
2 Developing Container Yard and Road at our CFS site, in Tuticorin – Sical Distriparks Limited, Tuticorin DEVELOPING CONCRETE YARD PAVEMENT March 2008
3 Developing Container Yard with Road at our CFS site, Ponnery High Road, Chennai – 600120 – Sical Distriparks Limited, Chennai DEVELOPING CONCRETE YARD PAVEMENT April 2008
4 Construction of two storey Administrative complex, Elevated Ware house, Laden Concrete container yard for 1.5 lakh sq ft, Laden WBM container yard for 1.00 lakhs Sq.ft, Internal Approach road, Open drain, compound wall 9’0” hollow block work and 3’0” height barbed wire fencing, Weigh bridge and operator’s cabin in the New CFS @ Milavittan, Tuticorin (AREA = 23234 SQM) LADEN CONTAINER CONCRETE AND WBM YARD, COMPLEX BUILDING, WAREHOUSE,DRAIN ETC June 2010
5 Construction of proposed Elevated ware house shed, at survey no.150,151 part,VichurVillage,ponneri taluk,Thiruvalluvar District(42000Sq.ft) ELEVATED WARE HOUSE July 2011
6 Providing concrete yard for the laden container staking yard- 20000 sq.mtr, Providing concrete yard for the 100 Ton Weigh bridge – 1000 S.Mtr, Repairs to the existing damaged import container yard – 2500 S. Mtr at Sical CFS, Chennai”. CONCRETE CONTAINER YARD April 2012
SICAL MULTI MODAL AND RAIL TRANSPORT LTD (CFS DIVISION)
1 Development of Laden paved container yard with base concrete at Tuticorin CFS including manufacture, supply and laying of 100mm thick heavy duty Cement concrete paver blocks of grade M50 to IS specifications. CONCRETE CONTAINER YARD August 2015

Start typing and press Enter to search