AIRPORTS AUTHORITY OF INDIA
SI.NO | DESCRIPTION OF WORK | TYPE OF WORK | COMPLETED DATE ON |
---|---|---|---|
1 | Re – Construction of Taxiway ‘J’ from Junction of Runway – 30 to Runway – 25 at Chennai Airport | CONCRETE PAVEMENT TAXIWAY | June 2007 |
2 | Construction of RCC Box Drains behind Bay No. 9 & 10 at Chennai Airport, Chennai | RCC BOX DRAIN | August 2008 |
3 | Re – construction of bays No.9 & 10 for parking of wide bodied aircraft’s at Chennai Airport, Chennai | CONCRETE PAVEMENT (PARKING BAY) | December 2008 |
4 | Construction of Security Compound Wall @ Runway – 12 for providing 150m Strip at Chennai Airport, Chennai (Phase – II). | COMPOUND WALL | February 2009 |
5 | Re – Construction Of Bay No 27 at Chennai Airport, Chennai | CONCRETE PAVEMENT (PARKING BAY) | December 2009 |
6 | Re – Construction of Bay No.8 including construction of RCC Box drain across the Proposed Area at Chennai Airport, Chennai | CONCRETE PAVEMENT (PARKING BAY) AND DRAIN< | January 2010 |
7 | Construction of Perimeter wall for encompassing AAI land at North of Runway 07 at Chennai Airport, Chennai | PERIMETER WALL | November 2010 |
8 | Construction of Angular taxi track (F1) connecting main runway 07-25 and B taxi track at Chennai Airport Chennai”. | CONCRETE PAVEMENT (TAXITRACK) CONNECTING MAIN RUNWAY | Feburary. 2013 |