SI.NO DESCRIPTION OF WORK TYPE OF WORK COMPLETED DATE ON
1 Re – Construction of Taxiway ‘J’ from Junction of Runway – 30 to Runway – 25 at Chennai Airport CONCRETE PAVEMENT TAXIWAY June 2007
2 Construction of RCC Box Drains behind Bay No. 9 & 10 at Chennai Airport, Chennai RCC BOX DRAIN August 2008
3 Re – construction of bays No.9 & 10 for parking of wide bodied aircraft’s at Chennai Airport, Chennai CONCRETE PAVEMENT (PARKING BAY) December 2008
4 Construction of Security Compound Wall @ Runway – 12 for providing 150m Strip at Chennai Airport, Chennai (Phase – II). COMPOUND WALL February 2009
5 Re – Construction Of Bay No 27 at Chennai Airport, Chennai CONCRETE PAVEMENT (PARKING BAY) December 2009
6 Re – Construction of Bay No.8 including construction of RCC Box drain across the Proposed Area at Chennai Airport, Chennai CONCRETE PAVEMENT (PARKING BAY) AND DRAIN< January 2010
7 Construction of Perimeter wall for encompassing AAI land at North of Runway 07 at Chennai Airport, Chennai PERIMETER WALL November 2010
8 Construction of Angular taxi track (F1) connecting main runway 07-25 and B taxi track at Chennai Airport Chennai”. CONCRETE PAVEMENT (TAXITRACK) CONNECTING MAIN RUNWAY Feburary. 2013